Posted by & filed under Frontpage, General Meetings, NYC DEP, Water Quality & Technical.

The Gowanus Canal Community Advisory Group, at its meeting of June 24, 2014, passed the following resolution:

The Gowanus CAG, established by the EPA, which represents a cross section of residents, businesses and civic organizations in and around the Gowanus Canal corridor, demand that New York City as one of the Responsible Parties, as defined by the EPA, actively and cooperatively work with the EPA on all aspects which they are accountable for as required by the Gowanus Record of Decision (ROD), but especially for the timely determining the number(s), size and location(s), and design engineering of the required sewage retention tanks.

To date, the City’s positions/policies concerning the Gowanus Canal and the ROD and their participation in the initial design phase and cooperation with the EPA has not produced the positive results that are required for the clean-up the Gowanus Canal to proceed within the proposed schedule. The Gowanus CAG was alarmed by the recent consent order issued by the EPA against the City of New York that would be an unnecessary expense for New York City tax payers. If New York City fails or refuses participate in the planning phase, the EPA under current law can and will charge the City three times (3X) the cost to plan and build the retention tanks.

Comments are closed.